Proposed Algorithm
B. Scheduling
- UBR:
The BS then schedules UBR traffic after the scheduling of CBR and VBR. If the mobile is in error state, the BS adds credit(s) in the corresponding entry in request table. Otherwise, the BS either schedules slot(s) to this VC or schedules the aggregate credits this VC has until there is no more slot available.