Scheduler architecture(Conts.)
reporting the priorities (due date or guarantee level) per-cell is obviously extremely inefficient as this would increase drastically the protocol overhead
- to solve this problem, use deadline curve
send the real time group deadline curve from slave scheduler to master scheduler while using as little as possible bandwidth
- compression reduces the overhead but loses fidelity
- a fixed number of segments and time parameters to minimize the information that needs to be exchanged